Projects

Halliburton App

Completed during Halliburton summer internship

- Data extraction programs run on PDFs to take out desired parameters and put into a dataframe for further analysis.

- These programs decreased processing time by over 99% and ran anomaly detection on results.

- Scans and extracts data from PDFs using pattern recognition and Machine Learning Algorithms all hosted on DataBricks Clusters.

- Programs to get PDF information from a variety of different file types.

- Individually created a Power App that takes in as inputs different PDFs and links the related PDFs internally through cloud storage.

- Automated pipeline workflow ran PDFs and attached data through various platforms such as SharePoint, Azure Blob Storage, and DataBricks, using Power Automate.

Wordle Game, 2024 - Java, JavaFX

- Created a Wordle (Word Guessing) Game based on the New York Times game.

- Generated new word each game, with save/load (locally) features that keep track of the word, progress in the game, and previous guesses.

- Animations and visuals using JavaFX.

- Kept a local leaderboard of high scores, average number of guesses, and total games played, among other data points.

Office Space Optimization Algorithm, 2022 - TAMU Hack 2022 - JavaScript and CSS

- In collaboration with CBRE.

- Found optimal company layout within a building given limits of building and floor capacity.

- Accounted for synergy and discord between different companies and workers affected.

- Adjustable scale for how much emphasis to put on certain aspects (such as putting more emphasis on filling the floor compared to priority synergy between workers).

Mouse Aim Trainer, 2022 - Python, Pygame

- Timed mouse aim trainer, receive points for clicking appearing targets, with more points the quicker it is clicked.

- Kept a leaderboard of high scores.

Soil Mixer and Sifter, 2022

- Volunteer Project for Reach Unlimited.

- Sifted dirt to remove large pieces of mulch, and used an AC motor to mix the soil with perlite.

- Built for clients with limited limb mobility. Spent 4 months on planning and construction.