Publication

Refereed Archival Journal Publications

  • Bae, J., Choi, K.and Oh, J.H. (2017). “Multi-Contextual Machine-Learning Approach to Modeling Traffic Impact of Urban Highway Work Zones.” Transportation Research Record: Journal of the Transportation Research Board, Transportation Research Board of the National Academies, accepted for publication by the Artificial Intelligence Committee of TRB, in press.
    (ISSN: 0361-1981; 5-Year Impact Factor – 0.778; H Index – 52)

  • Sinshu, J., Choi, K., Lavy, S., Li, W., and Rybkowski, Z. (2017). “Effects of Front-End Planning under Fast-Tracked Project Delivery Systems.” Journal of Construction Education and Research, ASC, accepted for publication, in press. 
    (ISSN: 1557-8771; Impact Factor – Not Calculated; H Index – 8)

  • Hosseinian, S., Choi, K., and Bae, J. (2017). “iRIER: A Decision-Support Model for Optimal Energy Retrofit Investments.” Journal of Construction Engineering and Management, ASCE, under second round of review.
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71) 

  • Choi, K., and Bae, J. (2017). “[ACT]2: Decision-Support Modeling for Accelerated Alternative Contract Provisions.”  Journal of Computing in Civil EngineeringASCE, under review. 
    (ISSN: 0887-3801; 
    5-Year Impact Factor – 2.127; H Index – 49)

  • Choi, K., and Lee, H.W. (2016). “Deconstructing the Construction Industry: A Spatiotemporal Clustering Approach to Profitability Modeling.” Journal of Construction Engineering and Management, ASCE, 142 (10), 04016051.
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Choi, K., Kim, Y.H., Bae, J., and Lee, H.W. (2016). “Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis.” Journal of Computing in Civil EngineeringASCE, 30 (4), 04015055. 
    (ISSN: 0887-3801; 
    5-Year Impact Factor – 2.127; H Index – 49)

  • Choi, K., Lee, H.W., Bae, J., and Bilbo, D. (2016). “Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions.” Journal of Construction Engineering and ManagementASCE, 142 (3), 04015085. 
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Choi, K., Lee, H.W., Mao, Z., Lavy, S., and Ryoo, B.Y. (2016). "Environmental, Economic, and Social Implications of Highway Concrete Rehabilitation Alternatives.” Journal of Construction Engineering and ManagementASCE, 142 (2), 04015079.
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Shakouri, M., Lee, H.W., and Choi, K. (2015). “PACPIM: New Decision-Support Model of Optimized Portfolios Analysis for Community-Based Photovoltaic Investment.” Applied Energy, Elsevier, 156 (2015), 607-617. 
    (ISSN: 0306-2619; 5-Year Impact Factor – 6.330; H Index – 67)

  • Lee, H.W., Oh, H., Kim, Y., and Choi, K. (2015). “Quantitative Analysis of Warnings in Building Information Modeling.” Automation in Construction, Elsevier, 51 (2015), 23-31.  
    (ISSN: 0926-5805; 5-Year Impact Factor – 2.827; H Index – 65)

  • Lee, H.W., Choi, K., and Gambatese, J.A. (2014). "Real Options Valuation of Phased Investments in Commercial Energy Retrofits under Building Performance Risks.” Journal of Construction Engineering and Management, ASCE, 140 (6), 15014004-1 to 15014004-8. 
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Choi, K., Haque, M., Lee, H., Cho, Y., and Kwak, Y.H. (2013). “Macroeconomic Labor Productivity and Its Impact on Firm’s Profitability.” 
    Journal of The Operational Research Society (Special Issue on Construction Management), Palgrave Macmillan, 2013 (64), 1258-1268.
    (ISSN: 0160-5682; 
    5-Year Impact Factor – 1.386; H Index – 75)

  • Cho, Y., Kabassi, K., Pyeon, J., Choi, K., and Wang, C. (2013). “Effectiveness Study of Temporary Pavement Markings Removal Methods in Roadway Construction Zones.” Journal of Construction Engineering and Management, ASCE, 139 (3), 257-266. 
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Choi, K., and Kwak, Y.H. (2012). “Decision-Support Model for Incentives/Disincentives Time-Cost Tradeoff.” Automation in Construction, Elsevier, 21 (2012), 219-228. 
    (ISSN: 0926-5805; 5-Year Impact Factor – 2.827; H Index – 65)

  • Choi, K., Kwak, Y.H., Pyeon, J., and Son, K. (2012). “Schedule Effectiveness of Alternative Contracting Strategies for Transportation Infrastructure Improvement Projects.” Journal of Construction Engineering and Management5-Year , ASCE, 138 (3), 323-330. 
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Choi, K., Son, K., Woods, P., and Park, Y. (2012). “LEED Public Transportation Accessibility and Its Economic Implications.”
    Journal of Construction Engineering and Management, ASCE, 138 (9), 1095-1102. 
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Son, K., Choi, K., Woods, P., and Park, Y. (2012). “Urban Sustainability Predictive Model Using GIS: Appraised Land Value versus LEED Sustainable Site Credits.” Journal of Construction Engineering and Management, ASCE, 138 (9), 1107-1112. 
    (ISSN: 0733-9364; 5-Year Impact Factor – 1.731; H Index – 71)

  • Kim, Y., Han, S., Shin, S., and Choi, K. (2011). “A Case Study of Activity-Based Costing in Allocating Rebar Fabrication Costs to Projects.”
    Journal of Construction Management and Economics, Taylor & Francis, 29 (5), 449-461. 
    (ISSN: 0144-6193; Impact Factor – Not Calculated; H Index – 60)

  • Choi, K., Lee, E., Ibbs, C.W., and Kim, Y. (2009). “Multifaceted Public Outreach and Cost-Benefit Analysis for Its Effectiveness Validation.”
    Journal of Construction Management and Economics, Taylor & Francis, 27 (8), 771- 782. 
    (ISSN: 0144-6193; Impact Factor – Not Calculated; H Index – 60)

  • Lee, E., Choi, K., and Lim, D.S. (2008). “Streamlined Strategies for Faster, Less Traffic-Disruptive Highway Rehabilitation in Urban Networks.” Transportation Research Record: Journal of the Transportation Research Board, No. 2081, Transportation Research Board of the National Academies, 38-45.
    (ISSN: 0361-1981; Impact Factor – 0.778; H Index – 52)

  • Lee, E. and Choi, K. (2006). “Fast-Track Construction for Concrete Pavement Rehabilitation: California Urban Highway Network.”
    Transportation Research Record: Journal of the Transportation Research Board, No. 1949, Transportation Research Board of the National Academies, 3-10.
    (ISSN: 0361-1981; Impact Factor – 0.778; H Index – 52)  


Refereed Conference Proceedings

  • Bae, J., and Choi, K. (2017). “Machine-Learning Experimentation towards Autonomous Work Zone Mobility Impact Assessment.” The 2017 International Workshop on Computing in Civil Engineering (IWCCE 2017), Seattle, Washington, USA, June 25-27. 

  • Choi, K. (2017). “Machine-Learning for Automated Impact Prediction of Highway Construction.” The 2nd International Conference on Maintenance and Rehabilitation of Constructed Infrastructure Facilities (MAIREINFRA), Seoul, South Korea, July 19-21. 

  • Ryu, K.R., Choi, K., Bae., J., and Lee, D.W. (2017). “Effect of the Socio-Geographic Factors on Cost Overruns in Roadway Renewal Projects.” The 2nd International Conference on Maintenance and Rehabilitation of Constructed Infrastructure Facilities (MAIREINFRA), Seoul, South Korea, July 19-21. 

  • Lavy, S., Singh, N., Choi, K., and Justin, A. (2017). “The Future of Facility Management in the Fact of Rapidly Changing Technology.” The 2nd International Conference on Maintenance and Rehabilitation of Constructed Infrastructure Facilities (MAIREINFRA), Seoul, South Korea, July 19-21.
     
  • Rew, Y. Shi, X., Choi, K., and Park, P. (2017). “Materials and Structural Design of Heated Pavement Using Conductive Asphalt Concrete.” The 2nd International Conference on Maintenance and Rehabilitation of Constructed Infrastructure Facilities (MAIREINFRA), Seoul, South Korea, July 19-21. 

  • Choi, K., Lee, H.W., Bae, J, and Ryu, K. (2015). “Investigating the Construction Industry from Key Performance Measurements.” The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), Busan, South Korea, October 11-14.

  • Choi, K., and Bae, J. (2015). “Spatiotemporal Impact Assessments of Highway Construction: Autonomous SWAT Modeling.” The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), Busan, South Korea, October 11-14.

  • Ryu, K., Choi, K., Ryoo, B.Y., and Kang, J. (2015). “Design-Build Change Order Impacts in Highway Projects." The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), Busan, South Korea, October 11-14.

  • Ryoo, B.Y., and Choi, K. (2015). “Architecture for Integrated Real-Time Health Monitoring Using Wireless/Mobile Devices.” The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), Busan, South Korea, October 11-14.

  • Soto, J., Martinez, A., Khinvasara, R., Vakati, R.B., Savaliya, B., and Choi, K. (2015). “Improving Safety with Intelligent Transportation Curve Systems.“ The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), Busan, South Korea, October 11-14.

  • Gupta, S., Baker, M., Bigler, E., Parmar, V., Yellu, S., and Choi, K. (2015). “Smart Lighting Systems for 21st Century Highways: A Cost-Benefit Analysis.” The 6th International Conference on Construction Engineering and Project Management (ICCEPM 2015), Busan, South Korea, October 11-14.

  • Lee, H.W., Oh, H., Kim, Y., and Choi, K. (2014). “Investigating Warnings in Building Information Modeling.” UKC 2014, San Francisco, CA, August 6-9.

  • Lee, H.W., Choi, K., Gambatese, J., and Kim, D. (2014). "Financial Valuation Framework for Commercial Energy Retrofits under Private Risks." 2014 Construction Research Congress, Atlanta, GA, May 19-21.  

  • Choi, K., Ryoo, B.Y., and Kwak, Y.H. (2013). “Cluster-Driven Life-Cycle Cost Analysis Model for Transportation Infrastructure Improvement Projects.” UKC 2013, East Rutherford, NJ, August 7-11. 

  • Ryoo, B.Y., and Choi, K. (2013). “Integrating Project Management with IT for Corporate Portfolio Management Solutions.” UKC 2013, East Rutherford, NJ, August 7-11. 

  • Lee, H.W., Kim, Y., Kim, D., and Choi, K. (2013). "LEED Perception Disparities: Designers Versus Non-Designers." The 5th International Conference on Construction Engineering and Project Management, Anaheim, CA, January 9-11.  

  • Choi, K., and Kim, S.H. (2012). “Automating Spatiotemporal Work Zone Impact Analysis Required for Critical Civil Transportation Projects.” UKC 2012, Los Angeles, CA, August 8-11. 

  • Choi, K., Chung, K., Park, E.S., and Pyeon, J. (2011). “Stochastic Modeling for Quantifying Optimal Incentive Amounts of Early Project Completion.” The 28th International Symposium on Automation and Robotics in Construction, Seoul, South Korea, June 29 – July 2.

  • Pyeon, J., Choi, K., Park, M., and Kim, S. (2011). “Simulation Model to Predict Project Time and Cost Performance of Incentive/Disincentive Construction Projects.” The 28th International Symposium on Automation and Robotics in Construction, Seoul, South Korea, June 29 – July 2.

  • Choi, K., Lee, E.B., Kwak, Y.H., and Pyeon, J.H. (2011). “Optimal Incentive/Disincentive Predictive Model for Transportation Projects.” The 2nd International Conference on Transportation Construction Management, Federal Highway Administration, Orlando, FL, February 7-10.  
       
  • Ellis, R., Pyeon, J.H., and Choi, K. (2011). “Pit Proctor Utilization for Construction of Pavement Base Materials in the FDOT Construction Process.” The 2nd International Conference on Transportation Construction Management, Federal Highway Administration, Orlando, FL, February 7-10.
        
  • Choi, K., Kwak, Y.H., and Yu, B. (2010). “Quantitative Model for Determining Incentive/Disincentive Amounts through Schedule Simulations.” 2010 Winter Simulation Conference, Institute of Electrical and Electronics Engineers (IEEE), Baltimore, MD, December 5-8.

  • Kwak, Y.H., Choi, K., and Park, J. (2010). “Implications of Change Orders on Project Schedule and Cost.” Informs 2010 Annual Meeting, Institute for Operations Research and the Management Sciences, Austin, TX, November 7-10.

  • Choi, K., Ibbs, C.W., Pyeon, J. (2010). “Alternative Contracting Strategies: Are They Really Effective?” The 4th International Conference of Public Procurement (IPPC2010), Seoul, South Korea, August 26-28.

  • Choi, K. (2009). “A State-of-the-art Tool for Sustainable Rebuilding of Aging Infrastructure Systems.” 2009 American Society of Engineering Education Mid-Atlantic Conference, King of Prussia, Pennsylvania, October 23-24. 

  • Choi, K. and Lee, E.B. (2009). “Quantitative Analysis on Aspects of Project Performance.” 2009 United State-Korea Scientists Conference (UKC 2009), Raleigh, North Carolina, July 16-19. 

  • Lee, E.B., Choi, K., and Harvey, J.T. (2006). “Productivity Issues and Lessons-Learned From Two Long-Life Urban Freeway Concrete Rehabilitation Projects in California.” International Conference on Long-Life Concrete Pavements, Federal Highway Administration, Chicago, Illinois, October 24-27.

  • Lee, E.B. and Choi, K. (2006). “Innovative Fast-Track Approach to Concrete Pavement Rehabilitation in Urban Highway Network.” Paper No. 15359, Airfield and Highway Pavements Meeting Today's Challenges with Emerging Technologies, ASCE, Atlanta, Georgia, April 30- May 3.

  • Lee, E.B., and Choi, K. (2006). “Dynamic Approach to Public Outreach for Minimizing Traffic Inconvenience in Urban Highway Rehabilitation.” Preprints of the Transportation Research Board 85th Annual Meeting (CD-ROM: paper no: 06-1817), Transportation Research Board, TRB, National Research Council, Washington, D.C.

  •  Lee, E.B., Harvey, J.T., Choi, K., and Thomas, K.D. (2005). “Innovative Approach to Rapid Rehabilitation of Highway Concrete Pavement under High-traffic Volumes.” International Society for Concrete Pavements, International Conference on Concrete Pavements, Colorado Springs, Colorado, Aug. 14-18.


Research Reports                                                   

  • Anderson, S., Quiroga, C., Overman, J., Choi, K., Sahu, J., Kermanshachi, S., Goodrum, P., Taylor, T., and Li, Y. (2015). “Effective Project Scoping Practices to Improve On-Time and On-Budget Delivery of Highway Projects: Project Scoping Process Guidelines.” Final Technical Report, National Cooperative Highway Research Program, Transportation Research Board, Washington, D.C. 

  • Choi, K., and Joh, K. (2015). “Scoping and Managing Critical Transportation Infrastructure Projects.” Final Technical Report, University's Action 2015 for Education First Initiative, Texas A&M University, College Station, TX.  

  • Ettelman, B., Bricka, S., Choi, K., Geiselbrecht, T., Miller, K., Joh, K., and Wagner, J. (2013). “Exploring New Technology: Results of the Oak Hill Parkway Virtual Open House Pilot.” Final Technical Report prepared for the Texas Transportation Commission and the 83rd Texas Legislature, Texas A&M Transportation Institute, College Station, TX. 

  • Choi, K., Park, E.S., Bae, J. (2013). “Decision-Support Framework for Quantifying the Most Economical Incentive/Disincentive Dollar Amounts for Critical Highway Pavement Rehabilitation Projects.” Final Technical Report, Southwest Region University Transportation Center, Texas A&M Transportation Institute, College Station, TX. 

  • Choi, K. (2008). “Innovative Contracting Methods Implementation Studies.” Research Report, Division of Research and Innovation, California Department of Transportation, Sacramento, CA.

  • Lee, E.B., Harvey, J.T., and Choi, K. (2006). “Innovative Fast-Track Approach to Minimizing Public Inconvenience in Heavily Trafficked Urban Highway Rehabilitation.” Technical Report, California Department of Transportation, Sacramento, CA.

  • Lee, E.B., Choi, K., and Harvey, J.T. (2005). “Pre- and Postconstruction Analysis of the Interstate 15 (Devore) Concrete Rehabilitation Project.” Research Report (UCPRC-RR-2005-14), Office of Roadway Research, Division of Research and Innovation, California Department of Transportation, Sacramento, CA.  


Working ABE Manuscripts: All But Editorial work  

  • Choi, K., and Bae, J. (2017). “Cost Effectiveness of Highway Innovative Contracting Projects.” Journal of Construction Engineering and Management, ASCE.

  • Ryu, K., Choi, K., and Bae, J. (2017). “Performance Effect of Infrastructure Design-Build Projects from Change Order Frequency and Occurrence Timing.” Journal of Construction Engineering and Management, ASCE.

Working PMS Manuscripts: Progress Made towards Submission

  • Bae, J., and Choi, K. (2017). “Big-Data Summarization and Characterization for Streamlined Transportation Planning .” Journal of Computing in Civil Engineering, ASCE.

  • Choi, K., Bae, J., and Shashank, T. (2017). “Estimating Road User Cost with Heterogeneous Value of Traveler’s Time.” Journal of Computing in Civil Engineering, ASCE.

  • Choi, K. (2017). “Decision-Support Model of Optimal Incentives/Disincentives.” International Journal of Project Management, Elsevier.





 Copyright @ 2017 Professor Kunhee CHOI All Rights Reserved.